SECONDARY CONTROL VALVE BODY INSTALLATION[FS5A-EL]


id051721807600


On‐Vehicle Installation

1.  Install the tubular pin and O-ring to the transaxle case.

am3zzw00003599

2.  Install the secondary control valve body component and ground.

am3zzw00003600

Tightening torque
7.8—10.8 N·m
{80—110 kgf·cm, 70—95 in·lbf}
Bolt length (measured from below the head)
B: 40 mm {1.575 in}
C: 50 mm {1.967 in}

3.  Match the harness colors, then connect the solenoid connector.

Spring

Color of connector (harness side)

Pressure control solenoid B
White
Shift solenoid F
Black

4.  Apply a light coat of silicon sealant to the contact surfaces of the oil cover and transaxle case.

am3zzw00003601

5.  Install the oil cover.

Tightening torque
7.8—10.8 N·m {80—109 kgf·cm, 70—95 in·lbf}

6.  Install the battery, battery box and battery tray. (See BATTERY REMOVAL/INSTALLATION[LF, L3].)

7.  Connect the negative battery cable.

8.  Install the battery duct and battery cover. (See BATTERY REMOVAL/INSTALLATION[LF, L3].)

9.  Add ATF. (See AUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT[FS5A-EL].)

10.  Carry out the mechanical system test. (See MECHANICAL SYSTEM TEST[FS5A-EL].)

11.  Carry out the road test. (See ROAD TEST[FS5A-EL].)