VARIABLE BOOST CONTROL (VBC) SOLENOID VALVE INSPECTION [MZR-CD 2.2]


id0113f3804600


Air Tightness Inspection

1.  Connect a vacuum pump to the VBC solenoid valve port A, and apply vacuum.

am6zzw00003152

Note
•  Even if there is vacuum leakage, the VBC solenoid valve is okay if vacuum increases to –80 kPa {–600 mmHg, –24 inHg} or more.

2.  Verify that the vacuum increases to –80 kPa {–600 mmHg, –24 inHg} or more.

•  If not as specified, replace the VBC solenoid valve. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR-CD 2.2].)
•  If VBC solenoid valve is okay, perform the “Operation Inspection”. (See Operation Inspection.)


Operation Inspection

1.  Connect a vacuum pump to the VBC solenoid valve port A, and apply vacuum.

2.  Switch the ignition to on.

3.  Simulate the VBCV PID to 100% using the M-MDS. (See ON-BOARD DIAGNOSTIC TEST [MZR-CD 2.2].)

4.  Verify that the vacuum is decreased.

•  If not as specified, replace the VBC solenoid valve. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR-CD 2.2].)
•  If VBC solenoid valve is okay, perform the “Resistance Inspection”. (See Resistance Inspection.)


Resistance Inspection

1.  Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR-CD 2.2].)

2.  Disconnect the VBC solenoid valve connector.

3.  Measure the resistance between the VBC solenoid valve terminals.

am6zzw00003153

VBC solenoid valve resistance
11—13 ohms [20°C {68°F}]
•  If not as specified, replace the VBC solenoid valve. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR-CD 2.2].)