1. For R.H.D. (L3 Turbo), remove the insulator. (See EXHAUST SYSTEM REMOVAL/INSTALLATION [L3 Turbo].)
2. Remove in the order indicated in the table.
3. Install in the reverse order of removal.

|
1
|
Brake fluid level sensor connector
|
|
2
|
Brake pipe
|
|
3
|
Brake pipe (without ABS (ABS/TCS) or DSC)
|
|
4
|
Hose (MTX)
|
|
5
|
Master cylinder
|
|
6
|
O-ring
|
1. Install the SST to the power brake unit as shown, and tighten within the specified torque.
Tightening torque
2. Using a vacuum gauge, create a vacuum pressure of 66.7 kPa {500 mmHg, 19.7 inHg} in the power brake unit.
3. Using calipers, measure dimension L as shown.
Specification
4. If dimension L is not within the specification as shown, remove SST (49 G043 001) and use SST (49 B043 004) to adjust the length of the push rod while using SST (49 E043 003A) to keep the push rod from rotating.
5. Remove the SSTs, replace SST (49 G043 001) and measure dimension L again.
6. Install the master cylinder to the power brake unit.