Position Indicator RIV Method
ADJUSTING INJECTION TIMING (BEGIN OF DELIVERY) (POSITION INDICATOR RIV METHOD) - FOLLOWING CHECKUPTesting and adjusting value
RI-adjusting value (indirect injection timing) -15° (after TDC)
Tightening torque
Closing plug on regulator (measuring point) 30-35 Nm (22-26 ft lb)
Special Tool
Note: Check begin of delivery prior to adjustment. Position Indicator RIV Method
Adjusting
1. Mount holding bracket (01) on injection pump housing.
2. Place adjusting device (02) on cylinder head screws and holding fork (arrows).
3. Rotate crankshaft once in direction of rotation and set to 150 after TDC.
4. Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).
5. Adjust begin of delivery by turning hex. head screw (arrow) (-15° after TDC).
Swivelling direction of injection pump
Toward engine = advances begin of delivery
Away from engine = retards begin of delivery
6. Tighten nuts and screw for injection pump and check preset value.
7. Run engine and check for leaks.
8. Check oil level and correct, if required.