Power and Ground Distribution: Testing and Inspection
AR54.18-P-0600-01A Checking Wiring Harness
Special Tools:
Special Tools:
During tests on the supplemental restraint system control unit a corresponding test cable must be used in combination with the 126-pin socket box.
1. Connect electrical connection kit with test cable.
2. Check lines for resistance using a continuity meter as per the wiring diagram, starting at the corresponding control unit.
The resistance must be < 0.5 ohms
3. Perform system test in accordance with diagnosis specifications.