Operation CHARM: Car repair manuals for everyone.

Delayed Engagement Into Reserve





CAUSE/REMEDY:
1. Accumulator switching on (53) in Reverse disable (for illustration see Location of Components). Location of Components
2. Large intermediate plate bore no. 80 modified, new diameter = 2.1 mm (was 2.4 mm).
3. One ball less required in shift valve body (removed from, position 14a); total 17 balls (18 balls before modification).

Production Phase-In As Of Transmission Number: 3 447000 (O6/92)