Test V
PINPOINT TEST V: THE POWER SLIDING DOOR IS INOPERATIVE FROM AN INDIVIDUAL SWITCH - NO DTCS ARE RETRIEVEDTest V1-V3:
Test V3-V5:
Test V5-V7:
Test V7-V9:
Test V9-V11:
Test V11-V13:
Test V13-V15:
Test V15-V17:
Normal Operation
Pressing the overhead console left PSD open/close switch supplies a momentary ground signal on circuit 1244 (WH/LG) to the SJB or circuit 1237 (LG/RD) when the right PSD open/close switch is pressed. Then the SJB sends a signal on circuit 1429 (GY/YE) to the LPSDM or on circuit 1430 (TN/RD) to the RPSDM. The PSD module will open the power sliding door by providing 12 volts to the motor and clutch, if conditions are correct; or close the power sliding door. Pressing the right or left B-pillar power sliding door open/close switch will provide a momentary ground signal on circuit 1238 (TN/LB) to the left PSD module or on circuit 465 (TN/LB) to the right PSD module. Then the PSD module will open the power sliding door by providing 12 volts to the motor and clutch, if conditions are correct; or close the power sliding door.
Possible Causes
- circuit 465 (TN/LB) open
- circuit 1203 (BK) open
- circuit 1205 (BK) open
- circuit 1237 (LG/RD) open
- circuit 1238 (TN/LB) open
- circuit 1244 (WH/LG) open
- circuit 1429 (GY/YE) open
- circuit 1430 (TN/RD) open
- b-pillar switch
- overhead console switch assembly
- PSD module
- SJB