Installing Replacement Transmission (AISIN)
24 00 051 - Installing replacement transmission (AISIN)
Important!
Before installing replacement transmission:
After completing work:
- Check oil level Service and Repair.
Use only the approved automatic transmission fluid.
- Reset adaptation values.
- Perform clutch and gear ratio adaptation.
Failure to comply with this requirement will result in serious damage to the automatic transmission!
Recycling:
Catch and dispose of escaping transmission fluid.
Observe country-specific waste-disposal regulations
Necessary preliminary tasks:
- Remove automatic transmission Removing and Installing Transmission (AISIN).
Convert following parts from previous transmission to new transmission.
- Converter, transportation lock (1).
- Holder, shift cable (R56 only)
Tightening torque: 24 11 5AZ [1][2]Fluid Pan, A/T
- Bracket with retaining clips for wiring harness
- Transportation plate
- Transmission carrier with transmission bearing block (not R56)
Tightening torque, 24 11 9AZ [1][2]Fluid Pan, A/T.