Warranty Information
Submit as Recall Claim type "C", option "E-5" on your Diamond Network System. DO NOT SUBMIT AS "W" CLAIMS.A. Required Operation
Labor Operation Code: C9010PXX
Time Allowance: 2.3 hr.
NOTE: The "0" in the above labor code is the number ZERO.
A sample required work claim is shown. A sample of the required and conditional work claim is shown.
B. Conditional Operation
The conditional operations are performed ONLY if there is a need for them. If the exhaust manifold inspection reveals leakage, the exhaust manifold must be replaced. If during the carburetor feedback testing procedures the Jet Mixture Solenoid Valve, Oxygen Sensor, or the Front Catalytic Converter are found to be inoperative they also must be replaced as directed in this bulletin. Add these times to the labor operation time allowance as needed.
R & R Exhaust Manifold
Time Allowance: 0.6 hr.
R & R Oxygen Sensor
Time Allowance: 0.2 hr.
R & R Jet Mixture Solenoid Valve (includes retest of the carburetor feedback system)
Time Allowance: 0.4 hr.
R&R Front Catalytic Converter
Time Allowance: 0.4 hr.