Operation CHARM: Car repair manuals for everyone.

Computers and Control Systems: Specifications


Valve Clearance (HOT)
Intake 0.15mm (0.006 in.)
Exhaust 0.25mm (0.010 in.)

Firing Order 1-3-4-2

Idle Speed [1] 750 ± 100 RPM
Idle Mixture [2]





TIGHTENING TORQUE SPECIFICATIONS:

Catalyst To Center Exhaust Pipe Bolts 30 - 40 NM (22 - 29 ft.lbs..)

Catalyst To Front Exhaust Pipe 40 - 60 NM (29 - 43 ft.lbs..)

EGR Valve Installation Bolt 10 - 15 NM (7.2 - 10 ft.lbs..)

EGR Temperature Sensor 10 - 12 NM (7.3 - 8.6 ft.lbs..)

Engine Coolant Temperature Sensor 20 - 40 NM (15 - 29 ft.lbs.)

PCV Valve 8 - 12 NM (6 - 8.5 ft.lbs..)

EGR Thermo Valve 20 - 40 NM (15 - 30 ft.lbs..)

TPS Mounting Screws 1.5 - 1.8 NM (1.1 - 1.8 ft.lbs.)





[1] Not Adjustable.
[2] Refer to ADJUSTMENT PROCEDURES.