Operation CHARM: Car repair manuals for everyone.

VDC/TCS/ABS

Solenoid and VDC Change-Over Valve System Inspection

INSPECTION PROCEDURE
1.SELF-DIAGNOSIS RESULT CHECK
Check self-diagnosis results.





Is the above displayed in the self-diagnosis display items?
YES - GO TO 2.
NO - Inspection End.

2.CONNECTOR INSPECTION
1. Disconnect ABS actuator and electric unit (control unit) connector E125.
2. Check the terminals for deformation, disconnection, looseness or damage.
OK or NG
OK - GO TO 3.
NG - Repair or replace as necessary.

3. CHECKING SOLENOID POWER AND GROUND








1. Check voltage between ABS actuator and electric unit (control unit) harness connector E125 and body ground.








2. Check resistance between ABS actuator and electric unit (control unit) harness connector E125 and body ground.
OK or NG
OK - Perform self-diagnosis again. If the same results appear, replace ABS actuator and electric unit (control unit).
NG - Repair the circuit.