Checking Equipment
Checking/Loading Equipment
CONSULT-II Data Link Connector (DLC) Circuit:
NOTE: The CONSULT-II must be used in conjunction with a program card. CONSULT-II does not require loading (Initialization) procedure.
Inspection Procedure:
Be sure the CONSULT-II is turned off before installing or removing a program card.