Operation CHARM: Car repair manuals for everyone.

Planetary Carrier

PLANETARY CARRIER

Disassembly and Assembly
DISASSEMBLY





1. Remove the snap ring.
2. Remove the sun gear assembly from the planetary carrier assembly, using suitable tool.





3. Remove the snap ring from the sun gear assembly, using suitable tool.





4. Remove the carrier bearing from the sun gear, using Tools.
Tool number
A: ST35300000 ( - )
B: ST30021000 (J-22912-01)





5. Remove the needle bearing from the sun gear, using Tool.
Tool number: ST33710000 ( - )





6. Remove the metal bushing from the sun gear, using Tools.
Tool number
A: ST33710000 ( - )
B: ST35325000 ( - )
C: KV381054S0 (J-34286)

INSPECTION AFTER DISASSEMBLY
Bearing





Check the bearing for damage and rough rotation. If necessary, replace the bearing with a new one.

Planetary Carrier





^ Measure the end play of each pinion gear. If it is out of specification, replace the planetary carrier assembly with new one.
Pinion gear end play: 0.1 - 0.7 mm (0.004 - 0.028 inch)
^ Check the working face of each gear and bearing for damage, burrs, partial wear, dents and other abnormality. If any is found, replace the planetary carrier assembly with a new one.

Sun Gear





^ Check if the oil passage of the sun gear assembly is clogged. For this, try to pass a 3.6 mm (0.142 inch) dia. wire through the oil passage as shown.
^ Check the sliding and contact surface of each gear and bearing for damage, burrs, partial wear, dents and other abnormality. If any is found, replace the sun gear assembly with a new one.

Internal Gear





Check the internal gear teeth for damage, partial wear, dents or other abnormality. If any is found, replace the internal gear with a new one.

ASSEMBLY





1. Apply ATF to the metal bushing, then install the metal bushing until it becomes "Dimension A", using Tool.
Tool number: ST35300000 ( - )
Dimension A: 7.7 - 8.3 mm (0.303 - 0.327 inch)

CAUTION: Do not reuse metal bushing.





2. Apply ATF to the needle bearing, then install the needle bearing until it becomes "Dimension B", using Tool.
Tool number: ST33220000 ( - )
Dimension B: 62.5 - 63.1 mm (2.461 - 2.484 inch)

CAUTION: Do not reuse needle bearing.





3. Install the carrier bearing to the sun gear, using Tools.
Tool number
A: ST30720000 (J-25405)
B: ST27863000 ( - )





4. Install the new snap ring to the sun gear assembly, using suitable tool.

CAUTION: Do not reuse snap ring.





5. Install the sun gear assembly to the planetary carrier assembly.
6. Install the new snap ring to the planetary carrier assembly.

CAUTION: Do not reuse snap ring.