Front Power Window LH Circuit Inspection
POWER WINDOW SYSTEM
Front Power Window LH Circuit Inspection
1.CHECK MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH OUTPUT SIGNAL
1. Turn ignition switch ON.
2. Check voltage between main power window and door lock/unlock switch connector and ground.
OK or NG
OK - GO TO 2.
NG - Replace main power window and door lock/unlock switch. Service and Repair.
2.CHECK POWER WINDOW MOTOR CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect main power window and door lock/unlock switch and front power window motor LH.
3. Check continuity between main power window and door lock/unlock switch connector D5 (A) terminals 6, 7 and front power window motor LH connector D8 (B) terminals 1, 3.
4. Check continuity between main power window and door lock/
unlock switch connector (A) terminals 6, 7 and ground.
OK or NG
OK - Replace front power window motor LH. Removal and Installation.
NG - Repair or replace harness.