Assembly
SHIFT CONTROL COMPONENTS
Assembly
1.Install OD fork rod and OD shift fork. Then install new retaining pin into OD shift fork.
CAUTION:
Do not reuse retaining pin.
2.Install 1st and 2nd, 3rd and 4th, and reverse shift forks onto coupling sleeve.
3.Install striking rod into hole of shift forks, striking lever and interlock and then install new retaining pin into striking lever using
Tool.
Tool number: ST-23540000 (J-25689-A)
CAUTION:
- Make sure that striking rod moves smoothly.
- Do not reuse retaining pin.
4.Apply sealant to thread of OD and reverse fork rod bolt, and then install OD and reverse fork rod.
OD and reverse fork rod boltOverhaul
-Use Genuine Medium Strength Thread Locking Sealant or the equivalent. Recommended Chemical Products And Sealants.