Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Right Bank11.60.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank10.20.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Both Banks17.80.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R. Pump, Add0.80.0A
With AC, Add0.40.0A