Operation CHARM: Car repair manuals for everyone.

I.S.O. Flare

Fig. 29 I.S.O. flare:





1. Obtain correct size I.S.O. fittings and tubing, which is determined by outside diameter of tubing being replaced.
2. Cut tubing to desired length, leaving approximately 1-8 inch on either end to allow for flare.
3. Position fittings on tube before starting flare.
4. Using tool No. J-28629, make flare using instructions included with kit, Fig. 29.