Chart C-10A A/C Clutch Circuit Diagnosis (Early Production)
Chart C-10 - A/C Clutch Control (Part 1 of 2) Early Production:
Wiring Diagram for Chart C-10 A/C Clutch Control Early Production:
CHART C-10A
(Part 1 of 2) A/C CLUTCH CIRCUIT DIAGNOSIS (EARLY PRODUCTION)
Circuit Description:
The A/C relay is ECM controlled to delay A/C clutch engagement .4 seconds after A/C is turned "ON." This allows the IAC to adjust engine rpm before the A/C clutch engages. The ECM also causes the relay to disengage the A/C clutch during WOT operation. The A/C relay is energized when the ECM provides a ground path for CKT 366.
Test Description: Numbers below refer to circled numbers on the diagnostic chart.
1. Checks to see if ECM is controlling A/C clutch control relay.
2. Checks operation of A/C cycling switch.
3. Checks for open circuit on either side of relay coil.
Chart C-10 - A/C Clutch Control (Part 2 of 2) Early Production:
CHART C-10A
(Part 2 of 2) A/C CLUTCH CIRCUIT DIAGNOSIS (EARLY PRODUCTION)
Test Description: Numbers below refer to circled numbers on the diagnostic chart.
4. Checks for battery voltage to relay through CKT 67.
5. Substitutes for relay to determine if problem is in relay or in CKT 59, A/C clutch coil, high pressure, switch, or ground.
6. Checks for open in CKT 67 between cycling switch and A/C fuse, or open CKT 67 to relay.
7. Checks to see that A/C "ON" signal is getting to ECM through CKT 67. A test light "OFF" at this time indicates CKT 67 is open between the cycling switch and the ECM.