Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| 928, 928 GTS | 18.1 | 12.9 | A | After Engine Is Removed. |
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Main Bearings, Renew | ||||
| 928, 928 GTS | 8.4 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |
| Crankshaft, Renew | ||||
| 928, 928 GTS | 8.4 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |
| Oil Pump, Renew | ||||
| 928, 928 GTS | 1.6 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |
| Oil Pump Screen, Clean | ||||
| 928, 928 GTS | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |
| Rear Main Oil Seal, Renew | ||||
| 928, 928 GTS | 0.4 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |
| Timing Belt, Renew | ||||
| 928, 928 GTS | 2.6 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |
| Tune-Up | ||||
| 928, 928 GTS | 0.8 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Jobs. |