Operation CHARM: Car repair manuals for everyone.

Test Point 2 - Power Supply for DME Control Unit and Fuel Pump

TEST POINT 2 - DME 944 Turbo

Power Supply





A) DME and KLR Control Unit (V) (located behind passenger's foot support).

Note: Turn off ignition and then pull off control unit plug!

Plugs of control units are locked with a catch. First unlock this catch and then swing plug off of the control unit.

Connect voltmeter with help of test leads on term. 35 and 5 or 18 and 5 in second test on the DME control unit.
Connect term. 6 and 14 on KLR control unit.
Turn on ignition.

Display = battery voltage each time.

Turn off ignition. Check and connect DME plug!
No display, then check:
Disconnect 14-pin plug on engine.
Connect voltmeter on term. 3 and ground on receptacle end. Turn on ignition.

Display = battery voltage.

No display, leave test connections and check:
Pull off DME relay G 5. Bridge term. 30 and 87 in CEL socket.

Display = battery voltage.

Pull off plug of one fuel injector. Connect voltmeter with help of test leads on one plug contact and ground.

Display = battery voltage.

Turn off ignition. Connect all plugs!

B) Fuel Pump

Start engine - fuel pump should be running while starting.
If not, check:

Fuse no.34(15 A)

Pull off relay G 5.
Bridge term. 30 and 87 b in CEL socket.

Fuel pump should run. Check wiring diagram for electric wire routing.