Connecting System Tester 2
CONNECTIONS:Connections:
Image Legend:
1. Ground connection
2. Connections for voltage and resistance measurements
3. Connections for current measurements with a clamp-on ammeter.
4. Two slots for PCMCIA cards. The upper slot is for the Diagnosis Card.
5. Socket for mains power supply unit
6. Serial port for connection of a mouse
7. Connection socket for a PS/2 keyboard.
8. Socket for VGA monitor
9. Parallel port for connection of a printer or a CDROM drive.
NOTE: Before current, voltage or resistance measurements: Use the ground lead to connect the ground socket (1) to the vehicle ground point prior to connecting the diagnosis lead.
Diagnostic Card:
Diagnosis Card:
The Diagnosis Card is the interface between the Porsche System Tester 2 and the vehicle
The Diagnosis Card is responsible for the diagnosis reports, control-module programming voltage and for voltage supply to the Porsche System Tester 2 via the vehicle battery.
The Diagnosis Card can be left in the Tester.
Voltage Supply:
Three types of voltage supply are possible for the Porsche System Tester 2:
- Internal rechargeable battery (operating time approx. 20 min)
- Vehicle battery (supply via plugged-on diagnosis lead, Diagnosis Card)
- Mains power supply.
Before putting the unit into operation, make sure that the mains voltage and the voltage specified on the mains power supply unit are the same.
Adjusting Illumination of LCD Panel:
Press key 2.5 and key 2.4 => Display brighter
Press key 2.5 and key 2.6 => Display darker
Working Log:
During diagnosis, e.g. when the fault memory is being read out, a "save" symbol appears near the softkeys. This item is saved in the working log if the corresponding softkey is pressed.
The working log can be printed out with key 2.3. It is thus possible to document all stored faults, for example.