Static test (ABS and ABS/TC)
Static Test (ABS And ABS/TC)
Electrical test of the system (advance check), e.g. after replacement of the hydraulic unit or if connectors were pulled off.
This test is menu-prompted (procedure according to Tester instructions).
IMPORTANT: This is not a substitute for the system test, as no check for swapped electrical and hydraulic lines is performed. Furthermore, the mechanical function of the solenoid valves is not tested.
If a fault is displayed, perform troubleshooting with the diagnosis/test plan.