Installation
HORN: HIGH PITCHED HORN: INSTALLATION
1. INSTALL HIGH PITCHED HORN ASSEMBLY
(a) Install the high pitched horn with the bolt.
Torque : 20 Nm (199 kgf-cm, 14 ft-lbf)
NOTICE:
Do not place the low pitched horn over the stopper of the body.
(b) Connect the horn connector.
2. INSTALL FRONT BUMPER COVER
Installation