Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Inspection

1. MAIN SWITCH







Set power window main switch to each position and check continuity between terminals as indicated in table:

2. SUB SWITCH







Set power window sub switch to each position and check continuity between terminals as indicated in table;

3. POWER WINDOW MOTOR
1. Make sure that power window motor rotates properly when battery voltage is applied to terminals of motor connector.
2. Change polarity of battery connections to terminals to ensure that motor rotates in reverse direction.

4. POWER WINDOW RELAY







Check continuity between terminals as indicated in table, when connecting the battery to terminal No.1 and No.3.