Manual Transmission/Transaxle: Service Precautions
When working with FIPG (Formed in Place Gasket) material, you must be observe the following:^ Using a razor blade and gasket scraper, remove all the old packing (FIPG) material from the gasket surfaces.
^ Thoroughly clean all components to remove all the loose material.
^ Clean both sealing surfaces with a non-residue solvent.
^ Apply the seal packing in approx. 1 mm (0.04 in.) bead along the sealing surface.
^ Parts must be assembled within 10 minutes of application. Otherwise, the packing (FIPG) material must be removed and reapplied.