Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION

1. INSTALL VVT SENSOR (for Bank 2)

(a) Exhaust side:

(1) Install the VVT sensor with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Intake side:

(1) Install the VVT sensor with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

2. INSTALL VVT SENSOR (for Bank 1)

(a) Exhaust side:

(1) Install the VVT sensor with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Intake side:

(1) Install the VVT sensor with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

3. INSTALL HARNESS PROTECTOR Installation

4. TEMPORARILY INSTALL NO. 1 SURGE TANK STAY Installation

5. TEMPORARILY INSTALL THROTTLE BODY BRACKET Installation

6. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation

7. FULLY TIGHTEN NO. 1 SURGE TANK STAY Installation

8. FULLY TIGHTEN THROTTLE BODY BRACKET Installation

9. CONNECT ENGINE ROOM MAIN WIRE Installation

10. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation

11. ADD ENGINE COOLANT Service and Repair

12. INSPECT FOR COOLANT LEAK Testing and Inspection

13. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY Installation

14. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY Installation

15. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY Installation

16. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH Installation

17. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH Installation

18. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

19. INSTALL NO. 1 ENGINE UNDER COVER Installation

20. INSTALL ENGINE UNDER COVER ASSEMBLY Installation