Shift and Lock-up Solenoid Inspection
INSPECT SOLENOIDa. Disconnect the connector from the ECT computer.
b. Measure the resistance between S1, S2, SL and ground.
STD: 11 - 15 Ohms
c. Apply battery voltage to the solenoid.
Check that an operation noise can be heard from the solenoid.
NOTE: If there is foreign material in the solenoid valve, there will be no fluid control even with solenoid operation.