Operation CHARM: Car repair manuals for everyone.

Engine Torque and Sequence

Tightening Torques

Cylinder Head
First Pass 79 Nm. (58 ft. lbf.)
Second Pass 90°

Intake Manifold
Tighten To 30 Nm. (22 ft. lbf.)

Camshaft Bearing Caps
Front Bearing Cap 30 Nm. (22 ft. lbf.)
Bearing Caps (Exc. Front) 9 Nm. (80 in. lbf.)

Main Bearing Caps
First Pass 20 Nm. (15 ft. lbf.)
Second Pass 40 Nm. (29 ft. lbf.)
Third Pass 90°

Rod Bearing Caps
First Pass 25 Nm. (18 ft. lbf.)
Second Pass 90°

Crankshaft Pulley
Tighten To 170 Nm. (125 ft. lbf.)

Flex Plate
Tighten To 98 Nm. (72 ft. lbf.)

Oil Pump
Tighten To 19 Nm. (14 ft. lbf.)

Exhaust Manifold
Tighten To 37 Nm. (27 ft. lbf.)

Water Pump
Tighten To 9.0 Nm. (80 in. lbf.)

Sequences


Cylinder Head




Removal




Installation


Camshaft Bearing Caps




Removal No.2 Camshaft




Removal No. 1 Camshaft




Installation No. 1 Camshaft




Installation No. 2 Camshaft

Main Bearing Caps

Removal:




Removal

Installation:




Installation

Flex Plate




Installation



Other

Cylinder Head Bolt Length
Standard 161.3 - 162.7mm (6.350 - 6.406 in.)
Maximum 164.2 mm (6.465 in.)