Integration Control and Panel
INTEGRATION CONTROL AND PANELI24 (A), I25 (B) INTEGRATION CONTROL AND PANEL
(B) 12 - GROUND : Approx. 12 volts with ignition SW on and blower SW on
(B) 4 - GROUND : Approx. 12 volts with ignition SW at ON or ST position
(B) 5 - GROUND : Always approx. 12 volts
(B) 13 - GROUND : Approx. 12 volts with ignition SW at ACC or ON position
(B) 1 - GROUND : Always continuity
(A) 11 - GROUND : Always continuity
CARGO LIGHT
I24 (A), I25 (B) INTEGRATION CONTROL AND PANEL
(B) 1 - GROUND : Always continuity
(A) 12 - GROUND : Always approx. 12 volts
AIR CONDITIONING
HEATER RELAY
1 - 2 : Closed with ignition SW on and heater blower SW on
A1 A/C DUAL PRESSURE SW
1 - 2 : Open with refrigerant pressure at less than approx. 2.0 kgf/sq.cm (196.1 kpa, 28.4 psi) or more than approx. 32.0 kgf/sq.cm (3138.1 kpa, 455 psi)
I24 (A), I25 (6) INTEGRATION CONTROL AND PANEL
(B) 4 - GROUND : Approx. 12 volts with ignition SW at ON or ST position
(B) 12 - GROUND : Approx. 12 volts with ignition SW on and blower SW on
(B) 1 - GROUND : Always continuity
(A) 11 - GROUND : Always continuity