Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Keyless Entry Module: Testing and Inspection

TERMINALS OF ECU

Terminals Of ECU/pinouts Part 1:




1. INSPECT INTEGRATION RELAY

a. Disconnect the connector from the integration relay.

Terminals Of ECU/pinouts Part 2:




b. Check the continuity between each terminal of the disconnected connector and the body ground, as shown in the illustration and table.

If the result is not as specified, the vehicle's side may malfunction.

Terminals Of ECU/pinouts Part 3:




c. Reconnect the connector and check the voltage between each terminal and the body ground, as shown in the illustration and table.

If the result is not as specified, the integration relay may malfunction.

Terminals Of ECU/pinouts Part 1:




2. INSPECT INSTRUMENTAL PANEL J/B (INTEGRATION RELAY)

a. Disconnect the connectors IA, IB, ID, IF, IH and IJ of the instrument panel J/B.

Terminals Of ECU/pinouts Part 2:




b. Check the continuity between each terminal of the disconnected connectors and the body ground, as shown in the illustration and table.

If the result is not as specified, the vehicle's side may malfunction.

Terminals Of ECU/pinouts Part 3:




c. Reconnect the connectors and check the voltage between each terminal and the body ground, as shown in the illustration and table.

If the result is not as specified, the integration relay or instrument panel J/B assembly may malfunction.