Variable Valve Timing Solenoid: Service and Repair
REMOVAL1. REMOVE V-BANK COVER
2. REMOVE AIR CLEANER
3. REMOVE INTAKE AIR SURGE TANK
4. REMOVE FUEL DELIVERY PIPE
5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE
a. Disconnect the 2 oil control valve connectors.
b. Remove the 2 bolts and 2 camshaft timing oil control valves.
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE
a. Install the 2 camshaft timing oil control valves to each cylinder head, and tighten the 2 bolts.
Torque: 9.0 Nm (92 kgf.cm, 80 in.lbf)
b. Connect the 2 oil control valve connectors.
2. INSTALL FUEL DELIVERY PIPE
3. INSTALL INTAKE AIR SURGE TANK
4. INSTALL AIR CLEANER
5. INSTALL V-BANK COVER