Installation
2GR-FE ENGINE CONTROL SYSTEM: ACTIVE CONTROL ENGINE MOUNT: INSTALLATION
INSTALLATION
1. INSTALL FRONT ENGINE MOUNTING INSULATOR ASSEMBLY
(a) Install the front engine mounting insulator assembly with the 3 nuts and cap.
Torque: 52 Nm (530 kgf-cm, 38 ft-lbf)
(b) Connect the duty vacuum switching valve connector and clamp.
(c) Install the 2 clamps.
(d) Connect the vacuum hose sub-assembly to the air cleaner cap sub-assembly and vacuum switching valve.
2. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET
(a) Install the transverse engine mounting bracket with the 3 bolts and nut.
Torque: 64 Nm (653 kgf-cm, 47 ft-lbf)
Torque: 87 Nm (887 kgf-cm, 64 ft-lbf)
3. INSTALL RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR Installation
4. INSTALL COOLER CONDENSER ASSEMBLY Installation
5. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY Installation
6. INSTALL HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch)
7. INSTALL HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch)
8. INSTALL RADIATOR GRILLE
9. CONNECT COOLING FAN ECU CONNECTOR Installation
10. CONNECT OIL COOLER HOSE Installation
11. CONNECT NO. 2 RADIATOR HOSE Installation
12. CONNECT NO. 1 RADIATOR HOSE Installation
13. INSTALL NO. 1 AIR CLEANER INLET Installation
14. INSTALL NO. 2 AIR CLEANER INLET Installation
15. INSTALL BATTERY Installation
16. INSTALL COOL AIR INTAKE DUCT SEAL Installation
17. ADD ENGINE COOLANT Service and Repair
18. INSPECT FOR COOLANT LEAK Testing and Inspection
19. INSPECT AUTOMATIC TRANSAXLE FLUID
HINT:
20. INSPECT FOR OIL LEAK
21. INSTALL NO. 1 ENGINE UNDER COVER Installation
22. INSTALL ENGINE UNDER COVER ASSEMBLY Installation
23. INSTALL V-BANK COVER SUB-ASSEMBLY Installation