Operation CHARM: Car repair manuals for everyone.

Installation








2GR-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION

INSTALLATION

1. INSTALL SPARK PLUG






(a) Install the 6 spark plugs.
Torque: 18 Nm (183 kgf-cm, 13 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY






(a) Install the 6 ignition coils with the 6 bolts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 6 ignition coil connectors.






(c) Install the 4 bolts [A].
Torque: 8.3 Nm (84 kgf-cm, 73 in-lbf)
(d) Install the nut [B].
Torque: 8.3 Nm (84 kgf-cm, 73 in-lbf)
(e) Install the 2 clamps [C].
3. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation

4. TEMPORARILY INSTALL NO. 1 SURGE TANK STAY Installation

5. TEMPORARILY INSTALL THROTTLE BODY BRACKET Installation

6. FULLY TIGHTEN NO. 1 SURGE TANK STAY Installation

7. FULLY TIGHTEN THROTTLE BODY BRACKET Installation

8. CONNECT ENGINE ROOM MAIN WIRE Installation

9. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation

10. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY

11. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY

12. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY

13. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH

14. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH

15. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

16. ADD ENGINE COOLANT Service and Repair

17. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection

18. INSTALL NO. 1 ENGINE UNDER COVER Installation

19. INSTALL ENGINE UNDER COVER ASSEMBLY Installation