Operation CHARM: Car repair manuals for everyone.

Back-Up Light Circuit








LIGHTING (EXT): LIGHTING SYSTEM: Back-up Light Circuit

Back-up Light Circuit

DESCRIPTION

The park/neutral position switch turns on when the shift lever is moved to R, causing the back-up lights to illuminate.

WIRING DIAGRAM





INSPECTION PROCEDURE

PROCEDURE

1. INSPECT FUSE (BK/UP LP)
(a) Remove the BK/UP LP fuse from the instrument panel junction block.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:






NG -- REPLACE FUSE
OK -- Continue to next step.
2. INSPECT REAR COMBINATION LIGHT





(a) Remove the rear combination light Removal.
(b) Apply battery voltage to the terminals of the connector, and check the LED illumination condition.
OK:






NG -- REPLACE REAR COMBINATION LIGHT
OK -- Continue to next step.
3. INSPECT PARK/NEUTRAL POSITION SWITCH





(a) Remove the park/neutral position switch Removal.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:






NG -- REPLACE PARK/NEUTRAL POSITION SWITCH
OK -- Continue to next step.
4. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - BATTERY)





(a) Disconnect the C19 switch connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:






NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
5. CHECK HARNESS AND CONNECTOR (BACK-UP LIGHT - PARK/NEUTRAL POSITION SWITCH AND BODY GROUND)





(a) Disconnect the C19 switch connector.
(b) for LH:
(1) Disconnect the S11 light connector.
(2) Measure the resistance according to the value(s) in the table below.
Standard Resistance:





(c) for RH:
(1) Disconnect the S12 light connector.
(2) Measure the resistance according to the value(s) in the table below.
Standard Resistance:






NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- PROCEED TO NEXT INSPECTION PROCEDURE SHOWN IN PROBLEM SYMPTOMS TABLE