Operation CHARM: Car repair manuals for everyone.

Installation








3UR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION

INSTALLATION

1. INSTALL GENERATOR ASSEMBLY






(a) Install the generator with the 3 bolts and nut.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)






(b) Connect the generator connector.
(c) Connect the generator wire with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
(d) Install the terminal cap.
(e) Install the harness bracket to the generator with the bolt.
Torque: 31 Nm (316 kgf-cm, 23 ft-lbf)
2. CONNECT OIL COOLER PIPE ASSEMBLY

3. CONNECT VANE PUMP ASSEMBLY

4. INSTALL FRONT FENDER APRON SEAL FRONT RH

5. INSTALL FAN AND GENERATOR V BELT

6. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

7. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH Installation

8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH Installation

9. INSTALL AIR CLEANER ASSEMBLY

10. INSTALL AIR CLEANER HOSE ASSEMBLY

11. INSTALL V-BANK COVER SUB-ASSEMBLY

12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL