Installation
3UR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 3 bolts and nut.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Connect the generator connector.
(c) Connect the generator wire with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)
(d) Install the terminal cap.
(e) Install the harness bracket to the generator with the bolt.
Torque: 31 Nm (316 kgf-cm, 23 ft-lbf)
2. CONNECT OIL COOLER PIPE ASSEMBLY
3. CONNECT VANE PUMP ASSEMBLY
4. INSTALL FRONT FENDER APRON SEAL FRONT RH
5. INSTALL FAN AND GENERATOR V BELT
6. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
7. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH Installation
8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH Installation
9. INSTALL AIR CLEANER ASSEMBLY
10. INSTALL AIR CLEANER HOSE ASSEMBLY
11. INSTALL V-BANK COVER SUB-ASSEMBLY
12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL