Operation CHARM: Car repair manuals for everyone.

Installation








2UZ-FE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION

INSTALLATION

1. INSTALL SPARK PLUG
(a) Using a 16 mm plug wrench, install the 8 spark plugs.
Torque: 18 Nm (178 kgf-cm, 13 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY






(a) Install the 8 ignition coil assemblies with the 8 bolts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect the 8 ignition coil assembly connectors.
3. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2) Installation

4. INSTALL NO. 2 AIR TUBE Installation

5. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE Installation

6. CONNECT NO. 1 WATER BY-PASS PIPE Installation

7. INSTALL FRONT FENDER APRON SEAL RH Installation

8. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1) Installation

9. INSTALL NO. 3 AIR TUBE Installation

10. INSTALL NO. 2 AIR HOSE Installation

11. INSTALL FRONT FENDER APRON SEAL LH Installation

12. INSTALL AIR CLEANER HOSE ASSEMBLY Installation

13. INSTALL THROTTLE BODY COVER ASSEMBLY Installation