Installation
2UZ-FE IGNITION: IGNITION COIL AND SPARK PLUG: INSTALLATION
INSTALLATION
1. INSTALL SPARK PLUG
(a) Using a 16 mm plug wrench, install the 8 spark plugs.
Torque: 18 Nm (178 kgf-cm, 13 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 8 ignition coils with the 8 bolts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)
(b) Connect the 8 ignition coil connectors.
3. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1) Installation
4. INSTALL NO. 3 AIR TUBE Installation
5. INSTALL NO. 2 AIR HOSE Installation
6. INSTALL FRONT FENDER APRON SEAL REAR LH Installation
7. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2) Installation
8. INSTALL NO. 2 AIR TUBE Installation
9. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE Installation
10. CONNECT NO. 1 WATER BY-PASS PIPE Installation
11. INSTALL FRONT FENDER APRON SEAL REAR RH Installation
12. INSTALL AIR CLEANER HOSE ASSEMBLY Installation
13. INSTALL THROTTLE BODY COVER ASSEMBLY Installation