Installation
2UZ-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 1): INSTALLATION
INSTALLATION
1. INSTALL AIR SWITCHING VALVE ASSEMBLY
(a) Install the air switching valve with the 3 nuts.
Torque: 16 Nm (163 kgf-cm, 12 ft-lbf)
NOTE: Do not hold the bracket of the air switching valve.
2. INSTALL NO. 3 AIR TUBE
(a) Temporarily install a new gasket and the No. 3 air tube to the exhaust manifold side with the 2 nuts.
(b) Install a new gasket and the No. 3 air tube to the air switching valve side with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Tighten the 2 nuts on the exhaust manifold side.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL NO. 2 AIR HOSE
(a) Install the No. 2 air hose.
(b) Connect the air pump connector.
(c) Connect the fuel hose clamp.
4. INSTALL FRONT FENDER APRON SEAL LH
(a) Install the fender apron seal with the 5 clips.
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: Some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.