Installation
2UZ-FE ENGINE CONTROL SYSTEM: KNOCK SENSOR: INSTALLATION
INSTALLATION
1. INSTALL KNOCK SENSOR
(a) Install the 2 sensors with the 2 nuts as shown in the illustration.
Torque: 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Connect the 2 sensor connectors.
2. INSTALL NO. 4 AIR INJECTION SYSTEM HOSE
3. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY Installation
4. INSTALL INTAKE MANIFOLD ASSEMBLY
(a) Install the intake manifold Installation.
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: Some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.