Operation CHARM: Car repair manuals for everyone.

Installation





METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION

1. INSTALL LIGHT CONTROL RHEOSTAT

(a) Attach the 2 claws to install the rheostat.

2. INSTALL NO. 2 SWITCH HOLE BASE Installation