Operation CHARM: Car repair manuals for everyone.

Removal





3MZ-FE EMISSION CONTROL: PURGE VALVE: REMOVAL

1. REMOVE FRONT WIPER ARM AND BLADE ASSEMBLY LH Removal

2. REMOVE FRONT WIPER ARM AND BLADE ASSEMBLY RH Removal

3. REMOVE COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY Removal

4. REMOVE WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY Removal

5. REMOVE OUTER COWL TOP PANEL SUB-ASSEMBLY Removal

6. REMOVE COOL AIR INTAKE DUCT SEAL Removal

7. REMOVE NO. 2 ENGINE ROOM SIDE COVER LH Removal

8. REMOVE AIR CLEANER CAP SUB-ASSEMBLY Removal

9. REMOVE AIR CLEANER CASE SUB-ASSEMBLY Removal

10. REMOVE EMISSION CONTROL VALVE SET

(a) Disconnect the connector and harness clamp.(*1)





(b) Disconnect the 2 purge line hoses.(*2)

(c) Remove the 2 nuts and emission control valve set.(*3)

11. REMOVE DUTY VACUUM SWITCHING VALVE

(a) Disconnect the hose.(*1)





(b) Remove the screw and duty vacuum switching valve.(*2)

HINT
The duty vacuum switching valve is the purge valve.