Installation
1GR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
1. INSTALL VVT SENSOR (for Bank 2)
(a) Apply a light coat of engine oil to the O-ring of the VVT sensor.
(b) Install the VVT sensor with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the sensor connector.
(d) Connect the No. 4 and No. 5 water by-pass hoses.
2. INSTALL VVT SENSOR (for Bank 1)
(a) Apply a light coat of engine oil to the O-ring of the sensor.
(b) Install the sensor with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the sensor connector.
3. INSTALL AIR CLEANER ASSEMBLY WITH ELEMENT Installation
4. INSTALL NO. 2 AIR CLEANER HOSE Installation
5. ADD ENGINE COOLANT Service and Repair
6. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
7. INSTALL V-BANK COVER Installation
8. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY Installation
9. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY
(a) Install the front wiper motor and link assembly Installation.
10. INSTALL NO. 1 ENGINE UNDER COVER Installation