Operation CHARM: Car repair manuals for everyone.

Installation





1NZ-FE ENGINE CONTROL SYSTEM: INTEGRATION RELAY: INSTALLATION

1. INSTALL INTEGRATION NO.1 RELAY

(a) Connect the 3 connectors.

(b) Attach the integration relay to the engine room relay block.

2. INSTALL RELAY BLOCK COVER NO. 1

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)