Installation
2TR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 3 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Connect the generator wire to terminal B with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(c) Install the terminal cap.
(d) Connect the generator connector.
2. INSTALL FAN AND GENERATOR V BELT Installation
3. INSTALL AIR CLEANER AND HOSE Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.