Installation
HEATING / AIR CONDITIONING: SOLAR VENTILATION ECU: INSTALLATION
1. INSTALL SOLAR VENTILATION ECU
(a) Connect the connector.
(b) Install the solar ventilation ECU with the bolt.
2. INSTALL AIR CONDITIONING CONTROL ASSEMBLY Installation
3. INSTALL RADIO RECEIVER WITH BRACKET (w/o Navigation System) Installation
4. INSTALL NAVIGATION RECEIVER WITH BRACKET (w/ Navigation System) Installation
5. INSTALL UPPER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY Installation
6. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH Installation
7. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation
8. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY Installation
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
10. INSTALL REAR NO. 3 FLOOR BOARD Installation
11. INSTALL REAR DECK FLOOR BOX Installation
12. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation