Radiator Cooling Fan Motor Relay: Testing and Inspection
2GR-FE COOLING: COOLING FAN RELAY: ON-VEHICLE INSPECTION
1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.
2. REMOVE ENGINE ROOM NO. 2 RELAY BLOCK COVER
3. INSPECT NO. 1 FAN RELAY (Marking: FAN NO. 1)
(a) Remove the relay from the engine room No. 2 relay block.
(b) Measure the resistance of the relay.
Standard resistance:
If the result is not as specified, replace the relay.
(c) Install the relay.
4. INSPECT NO. 2 FAN RELAY (Marking: FAN NO. 2)
(a) Remove the relay from the engine room No. 2 relay block.
(b) Measure the resistance of the relay.
Standard resistance:
If the result is not as specified, replace the relay.
(c) Install the relay.
5. INSTALL ENGINE ROOM NO. 2 RELAY BLOCK COVER
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL