Installation
2GR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION
1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR
(a) Using a 19 mm deep socket wrench, install the sensor and a new gasket.
Torque : 20 Nm (204 kgf-cm, 14 ft-lbf)
2. INSTALL KNOCK SENSOR Installation
3. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
(a) Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil pressure switch.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
(b) Using a 24 mm deep socket wrench, install the oil pressure switch.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
4. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET LH
(a) Install the mounting bracket with the 6 bolts.
Torque : 54 Nm (551 kgf-cm, 40 ft-lbf)
5. INSTALL WATER PUMP PULLEY Installation
6. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
7. INSTALL NO. 2 TIMING GEAR COVER
(a) Install the gear cover with the 2 bolts.
Torque : 6.0 Nm (61 kgf-cm, 53 in-lbf)
8. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
(a) Temporarily install the V-ribbed belt tensioner with the 5 bolts.
(b) Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(c) Tighten the other bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
Each bolt length is as follows:
9. INSTALL DRIVE SHAFT BEARING BRACKET
(a) Install the drive shaft bearing bracket with the 3 bolts.
Torque : 64 Nm (653 kgf-cm, 47 ft-lbf)
10. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
(a) Install a new gasket as shown in the illustration.
(b) Install the manifold with the 6 nuts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
11. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the No. 2 heat insulator with the 3 bolts.
Torque : 8.5 Nm (87 kgf-cm, 75 in-lbf)
12. INSTALL NO. 2 MANIFOLD STAY
(a) Install the No. 2 manifold stay with the bolt and nut.
Torque : 34 Nm (347 kgf-cm, 25 ft-lbf)
13. INSTALL OIL DIPSTICK GUIDE
(a) Install 2 new O-rings to the guide.
(b) Apply a light coat of engine oil to the O-rings.
(c) Push in the guide end into the guide hole.
(d) Install the No. 1 guide with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(e) Install the No. 2 guide with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(f) Install the dipstick.
14. INSTALL GENERATOR ASSEMBLY Installation
15. INSTALL COMPRESSOR WITH PULLEY ASSEMBLY Installation
16. INSTALL FAN & GENERATOR V BELT Installation
17. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH
(a) Install a new gasket as shown in the illustration.
(b) Install the manifold with the 6 nuts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
18. INSTALL INTAKE MANIFOLD
(a) Set a new gasket on each cylinder head.
NOTICE:
* Align the port holes of the gasket and cylinder head.
* Be careful of the installation direction.
(b) Set the intake manifold on the cylinder heads.
(c) Install and uniformly tighten the 6 bolts and 4 nuts in several passes.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(d) Connect the 6 fuel injector connectors.
19. INSTALL FUEL INJECTOR ASSEMBLY Installation
20. INSTALL NO. 2 ENGINE MOUNTING STAY RH
(a) Install the mounting stay with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
21. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts to the cylinder head.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
22. INSTALL INTAKE AIR SURGE TANK ASSEMBLY
NOTICE:
DO NOT apply oil to the bolts listed below:
(a) Install a new gasket to the surge tank.
(b) Using a 5 mm hexagon socket wrench, install the 4 bolts.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
(c) Install the surge tank with the 2 nuts and 2 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf) for bolt
Torque : 16 Nm (163 kgf-cm, 12 ft-lbf) for nut
(d) Connect the connector.
(e) Install the vacuum hose clamp with the bolt.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(f) Connect the union to check valve hose.
(g) Connect the No. 2 ventilation hose.
(h) Install the clamp and connect the throttle body connector.
(i) Connect the vapor feed hose.
(j) Connect the 2 water by-pass hoses to the throttle body.
23. REMOVE ENGINE FROM ENGINE STAND
(a) Install a sling device and chain block to the engine.
(b) Remove the engine from the engine stand.
24. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
(a) Clean the bolt and its hole.
(b) Apply adhesive to 2 or 3 threads of the bolt end.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or Equivalent
(c) Using SST, hold the crankshaft.
SST : 09213-70011
SST : 09330-00021
(d) Install the flywheel, drive plate and drive plate spacer on the crankshaft.
(e) Uniformly install and tighten the 8 bolts in the sequence shown in the illustration.
Torque : 83 Nm (850 kgf-cm, 61 ft-lbf)
NOTICE:
Do not start the engine for at least 1 hour after the installation.
25. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
(a) 2WD:
Install the automatic transaxle Installation.
(b) 4WD:
Install the automatic transaxle .
26. INSTALL TRANSFER ASSEMBLY (for 4WD)
27. INSTALL STARTER ASSEMBLY Installation
28. INSTALL ENGINE WIRE
(a) Install the engine wire to the engine.
29. INSTALL FRONT SUSPENSION CROSSMEMBER SUB-ASSEMBLY
(a) Attach the engine together with the transaxle to the suspension crossmember and mounting.
(b) Install the bolt which secures the engine mounting bracket to the mounting insulator.
Torque : 95 Nm (969 kgf-cm, 70 ft-lbf)
30. INSTALL FRONT CROSSMEMBER SUB-ASSEMBLY
(a) Install the bolt and nut which secures the engine mounting bracket to the mounting insulator.
Torque : 145 Nm (1,479 kgf-cm, 107 ft-lbf)
31. INSTALL ENGINE WITH TRANSAXLE
(a) Place the engine on an engine lifter.
HINT
Place the engine on wooden blocks or an equivalent so that the engine is level.
(b) Using the chain block, slowly install the engine to the vehicle and the intermediate shaft to the pinion.
CAUTION:
Do not raise the engine more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.
NOTICE:
* Make sure that the engine is clear of all wiring and hoses.
* While raising the engine into the vehicle, do not allow it to contact the vehicle.
* Align the matchmarks on the intermediate shaft and pinion.
(c) Temporarily install the suspension member and crossmember with the 10 bolts.
(d) Temporarily install the member brace rear RH and LH with the 6 bolts.
(e) Install the engine mounting insulator LH with the bolt and nut.
Torque : 56 Nm (571 kgf-cm, 41 ft-lbf)
NOTICE:
While holding the bolt in place, tighten the nut.
(f) Install the engine mounting insulator RH with the 2 bolts and 2 nuts.
Torque : 95 Nm (969 kgf-cm, 70 ft-lbf) for bolt and nut A
Torque : 52 Nm (530 kgf-cm, 38 ft-lbf) for nut B
(g) Tighten the suspension member and crossmember's bolts.
Torque : 96 Nm (979 kgf-cm, 71 ft-lbf) for bolt A
Torque : 145 Nm (1,478 kgf-cm, 107 ft-lbf) for bolt B
(h) Tighten the member brace rear's bolts.
Torque : 145 Nm (1,478 kgf-cm, 107 ft-lbf) for bolt C
Torque : 93 Nm (948 kgf-cm, 69 ft-lbf) for bolt D
(i) Remove the sling device and chain block.
(j) Remove the 2 bolts and No. 1 and No. 2 engine hangers.
32. INSTALL FRONT DRIVE SHAFT LH
(a) 2WD:
Install the drive shaft Installation.
(b) 4WD:
Install the drive shaft Installation.
33. INSTALL FRONT DRIVE SHAFT RH
(a) 2WD:
Install the drive shaft Installation.
(b) 4WD:
Install the drive shaft Installation.
34. CONNECT TIE ROD END SUB-ASSEMBLY LH Installation
35. CONNECT TIE ROD END SUB-ASSEMBLY RH Installation
36. CONNECT STEERING INTERMEDIATE SHAFT Installation
37. CONNECT FRONT STABILIZER LINK ASSEMBLY LH Installation
38. CONNECT FRONT STABILIZER LINK ASSEMBLY RH Installation
39. INSTALL FRONT AXLE HUB NUT LH
(a) Install the hub nut Installation.
40. INSTALL FRONT AXLE HUB NUT RH
(a) Install the hub nut Installation.
41. INSTALL FRONT WHEELS
42. INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY
43. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(a) Install the front exhaust pipe Installation.
44. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
(a) 2WD:
Connect the control cable Service and Repair.
(b) 4WD:
Connect the control cable .
45. CONNECT RADIATOR HOSE INLET
46. CONNECT RADIATOR HOSE OUTLET
47. CONNECT OIL COOLER HOSE
48. CONNECT SUCTION HOSE SUB-ASSEMBLY Installation
49. INSTALL DISCHARGE HOSE SUB-ASSEMBLY Installation
50. INSTALL RADIATOR RESERVOIR TANK ASSEMBLY
(a) Install the reservoir tank with the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Connect the 2 hoses
51. INSTALL ECM Installation
52. CONNECT HOSES AND CONNECTORS
(a) Connect the 2 ECM connectors.
(b) Connect the 2 heater hoses.
(c) Connect the fuel hoses.
(d) Connect the starter wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(e) Connect the 3 connectors and wire with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(f) Install the engine room junction block cover (upper).
53. INSTALL AIR CLEANER CASE
(a) Install the air cleaner case with the 3 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Connect the harness clamp.
54. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
(a) Install the air cleaner filter element onto the air cleaner case.
(b) Insert the hinge part of the air cleaner cap into the air cleaner case, then hang the 2 hook clamps.
(c) Tighten the No. 1 air cleaner hose clamp.
(d) Connect the No. 2 ventilation hose to the air cleaner hose.
(e) Connect the wire harness clamp and 3 vacuum hoses.
(f) Connect the VSV (intake air control) connector.
(g) Connect the mass air flow meter connector.
55. INSTALL BATTERY BRACKET REINFORCEMENT
(a) Install the bracket reinforcement with the 2 bolts.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
56. INSTALL FRONT BATTERY BRACKET
(a) Install the bracket front with the 4 bolts.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Attach the 2 wire harness clamps.
57. INSTALL BATTERY
58. REMOVE BATTERY CLAMP SUB-ASSEMBLY
(a) Attach the hook of the battery clamp to the battery bracket front.
(b) Temporarily tighten the nut and install the bolt.
(c) Adjust the battery clamp's position.
(d) Fully tighten the nut and bolt.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(e) Attach the 2 wire harness clamps.
59. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
60. INSTALL HOOD SUB-ASSEMBLY
(a) Install the hood Installation.
(b) Adjust the hood Adjustments.
61. ADD AUTOMATIC TRANSAXLE FLUID
(a) 2WD:
Add automatic transmission fluid Installation.
(b) 4WD:
Add automatic transmission fluid .
62. ADD TRANSFER OIL (for 4WD)
63. ADD ENGINE OIL Replacement
64. ADD ENGINE COOLANT Service and Repair
65. CHARGE REFRIGERANT Service and Repair
66. INSPECT FOR REFRIGERANT LEAK Service and Repair
67. INSPECT FOR ENGINE OIL LEAK Replacement
68. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
69. INSPECT FOR FUEL LEAK
70. INSPECT FOR EXHAUST GAS LEAK
71. INSPECT SHIFT LEVER POSITION
(a) 2WD:
Inspect the shift lever position Service and Repair.
(b) 4WD:
Inspect the shift lever position .
72. ADJUST TRANSMISSION CONTROL CABLE
(a) 2WD:
Adjust the shift lever position Service and Repair.
(b) 4WD:
Adjust the shift lever position .
73. INSTALL NO. 2 ENGINE UNDER COVER
(a) Install the under cover with the 2 clips.
74. INSTALL REAR ENGINE UNDER COVER LH
(a) Install the under cover with the 2 clips.
75. INSTALL REAR ENGINE UNDER COVER RH
(a) Install the under cover with the 2 clips.
76. INSTALL NO. 1 ENGINE UNDER COVER
(a) Install the under cover with the 4 bolts and 12 clips.
77. INSTALL V-BANK COVER SUB-ASSEMBLY
(a) Attach the 3 clips to install the engine cover.
78. INSTALL RADIATOR SUPPORT OPENING COVER
(a) Install the cover with the 9 clips.
79. ADJUST FRONT WHEEL ALIGNMENT
(a) Adjust the front wheel alignment Front Wheel Alignment.
80. INSPECT IDLE SPEED Engine