Installation
3UR-FBE EMISSION CONTROL: AIR INJECTION DRIVER: INSTALLATION
1. INSTALL AIR INJECTION CONTROL DRIVER (for Bank 2)
(a) Install the air injection control driver with the 2 screws.
Torque : 2.0 Nm (20 kgf-cm, 18 in-lbf)
2. INSTALL AIR INJECTION CONTROL DRIVER (for Bank 1)
(a) Install the air injection control driver with the 2 screws.
Torque : 2.0 Nm (20 kgf-cm, 18 in-lbf)
(b) Install the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. INSTALL AIR INJECTION CONTROL DRIVER ASSEMBLY
(a) Install the air injection control driver with the 3 bolts.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Connect the 2 wire harness clamps.
(c) Install the ground cable with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(d) Connect the 4 air injection control driver connectors.