Installation
2AR-FE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL NO. 1 ECM BRACKET
(a) Install the No. 1 ECM bracket with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(b) Connect the wire harness clamp.
(c) Connect the wire harness clamp.
(d) Install the nut.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
2. INSTALL ECM
(a) Install the No. 2 ECM bracket to the ECM with the 2 screws.
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
(b) Temporarily install the screw (B).
(c) Install the ECM with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(d) Install the screw (A).
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
(e) Tighten the screw (B).
Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)
(f) Connect the 2 ECM connectors and lower the 2 levers.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other part.
* Make sure that the 2 levers are securely locked.
(g) Connect the 2 wire harness clamps.
3. INSTALL BATTERY Installation
4. INSTALL COOL AIR INTAKE DUCT SEAL Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
6. PERFORM INITIALIZATION
Service Precautions