Installation
POWER DISTRIBUTION: POWER MANAGEMENT CONTROL ECU: INSTALLATION
1. INSTALL POWER MANAGEMENT CONTROL ECU
(a) Engage the 2 claws to install the power management control ECU.
2. INSTALL ECU INTEGRATION BOX
(a) Install the ECU integration box with the 2 nuts and bolt.
Nut - Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
Bolt - Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Engage the 3 clamps to connect the wire harness.
(c) Connect each connector.
3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY Installation
4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY Installation
5. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
6. INSTALL DECK FLOOR BOX RH Installation
7. INSTALL REAR NO. 3 FLOOR BOARD Installation
8. INSTALL REAR NO. 2 FLOOR BOARD Installation